Camps K1 and K2

In constructing the section from the "Kać" interchange at km 0+000 to Petrovaradin at km 6+900.00, the establishment of temporary construction camps K1 and K2 on the left bank of the Danube River, in the future bridge area, necessitated our provision of preliminary design for water supply and sewerage mains.

Addressing the absence of supply infrastructure, our water supply solution involved the implementation of tanks and pumping stations. For wastewater drainage, we devised a system incorporating impermeable septic tanks. Regarding stormwater management, we engineered a comprehensive solution where water is collected through a network of gullies and drains. Following treatment with separators, the water is discharged into nearby canals through a pumping station.

This project highlights our adeptness in resolving complex hydraulic challenges associated with temporary construction camps, showcasing our commitment to technical precision and innovative solutions in the realm of water supply, sewerage, and stormwater management for infrastructure development.

Year : 2022

Client : PMO

Investor : PE “Roads of Serbia”

Project Name : PE “Roads of Serbia”

Location : Novi Sad, Serbia

Water Supply Pipeline: HDPE - DN20÷90

Sewerage Pipeline: PVC, HDPE - DN110÷500

Total Pipeline Length: 3.00 km